Monitor and Control Charging of Your Electric Vehicle from the Palm of Your Hand
For Free*!

As part of our efforts to accelerate clean transportation alternatives in Massachusetts while effectively managing our distribution system, participating Massachusetts Municipal Light Plants are partnering with their energy efficiency program manager, Massachusetts Municipal Wholesale Electric Company, (MMWEC), to provide free of charge*, for a limited time, WiFi-equipped Level 2 residential electric vehicles chargers to customers signing on to our Scheduled Charging Program.

Click the picture to see the brochure.

What is a Scheduled Charging Program?

Scheduled charging is a set schedule to determine when you can and cannot use your charger at full power. Through the the Wi-Fi connection enabled in your charger, participating MLPs can set the charger to charge at a Level 1 rate (1.25KW) during periods of peak energy usage for the rest of our distribution system.

How it Works

Between the hours of 5:00 p.m. and 9:00 p.m. on non-holiday weekdays, your charger will function the same as a standard Level 1, plug in wall charger. Outside of this time period, the charger will automatically unlock to allow you full Level 2 fast-charging functionality.

Download: EV Charging 101

Emergency Scheduling

Sometimes major events happen on the electrical system outside of our control. To respond to these events, emergency emergency scheduling allows participating MLPs to temporarily access your charger via Wi-Fi connection to lower your charging rate until the event passes. This limits strain to our system and allows us to continue to deliver low-cost, reliable electricity.

* Participating MLPs includes those in Groton, Ipswich, Marblehead, Sterling, Shrewsbury, South Hadley, Wakefield and West Boylston. Charger incentives vary by MLP. For more details on this program, please call 413-589-0141 or email: EV@mmwec.org

EV Charger Incentive

Did You Know:

  • Costs for these peak charging events are spread across each MLP’s entire residential customer base.
  • Modern electric vehicles utilizing Level 2 charging can go from empty to full-charge in eight hours or less. Even with a slow charge rate before 9:00 p.m., your car will be fully charged at 5 a.m.
  • The Scheduled Charging Program offered by participating MLPs provides you with a FREE or discounted Chargepoint Wi-Fi Equipped Level 2 charger (a $650 value); customer arranges installation.

2018 Chevy Bolt Incentive

2018 Nissan Leaf Incentive